Contact Name And Number:
Gary Matthews, Water Distribution Supervisor (909) 620-2251
Location:
400 to 600 block of Vinton Avenue
Deadlines:
Construction scheduled for August 10, 2009, to be completed by October 2009.
![]() |
![]() |
Project Details:
The project consist of the installation of a 8" water main on Vinton Avenue. Access to residential and business will be maintained. Traffic control measures will be in place to direct traffic flow through the area.
Contact Name And Number:
Brian Henslee 909-620-3792
Location:
South Garey Avenue at the State Route 60 and 71 intersect
Deadlines:
Tentative construction scheduled in August 2009
Project Details:
Streetscape - Garey Avenue, Median & SR/71 Slope Beautification
Contact Name And Number:
Marla Doyle (909) 620-2261
Location:
Intersection of Mission Boulevard and State Route 71 Freeway
Date Of Construction:
Construction anticipated to take 24 months to complete. Motorists are advised to seek alternative routes during the construction period to avoid excessive delays.
|
Mission 71 Existing
|
Mission 71 Conceptual
|
Project Details:
The Mission Boulevard/ SR 71 Grade Separation project will remove the existing at-grade intersection of Mission Boulevard at SR 71 by constructing an overcrossing of Mission Boulevard over the existing SR 71 expressway. Six through lanes and two turning lanes are proposed for the overcrossing, and the design provides a compressed diamond configuration allowing full uncontrolled ingress and egress on SR 71 using standard freeway type on and off-ramps. Completion of the project will improve traffic circulation at this heavily used intersection.
For the more information please visit www.Mission71Project.com
Contact Name And Number:
Ron Chan 909-620-2275
Location:
Street Lights District 2 (CDBG) ; District 1 (Phase 2) (CDBG); District 2 (Phase 2) (CDBG); District 4; District 1 (CDBG); District 3
Deadlines:
Tentative construction scheduled in September 2009
Project Details:
Furnish and install street lights and service pedestals; pull boxes and tie into existing lighting circuits at various locations within Districts 1, 2, 3, and 4
Contact Name And Number: 
Marla Doyle (909) 620-2261
Location:
Southeast corner Garey Avenue and Olive Street
Date Of Construction:
Future study for new Police Facility

Project Details:
The City's new Police Facility will be located in the existing buildings at Garey Village, on the east side of Garey Avenue at Olive Street. The new facility will encompass approximately 120,000 square feet and will house all functions of the Office of the Chief of Police, Operations Division, Support Division, and Investigations Division. This includes an Emergency Operations Center, crime lab, jail facility and training/community center.
The scope of the facility was determined using recommendations through a Needs Assessment prepared in October 2002. The facility will utilize three of the existing buildings at Garey Village allowing the fourth building to be leased to another agency until needed by the Police Department.