Contact Name And Number:
Marla Doyle (909) 620-2261
Location:
Intersection of Mission Boulevard and State Route 71 Freeway
Date Of Construction:
Construction anticipated to take 24 months to complete. Motorists are advised to seek alternative routes during the construction period to avoid excessive delays.
|
Mission 71 Existing
|
Mission 71 Conceptual
|
Project Details:
The Mission Boulevard/ SR 71 Grade Separation project will remove the existing at-grade intersection of Mission Boulevard at SR 71 by constructing an overcrossing of Mission Boulevard over the existing SR 71 expressway. Six through lanes and two turning lanes are proposed for the overcrossing, and the design provides a compressed diamond configuration allowing full uncontrolled ingress and egress on SR 71 using standard freeway type on and off-ramps. Completion of the project will improve traffic circulation at this heavily used intersection.
For the more information please visit www.Mission71Project.com