About |
City Departments |
Residents |
Business |
Documents |
E-Services |
|||||
|
• F.A.Q.s |
•Commission Information •Code •YFMP • Community Services / Parks & Recreation • Finance • Library
|
• Living • Emergency Preparedness & Safety • Library • Recycle |
• Current Bids & RFPs: |
• VPD |
• GIS Maps: • Speedpay |
75°F
Partly Cloudy
| Effective | 01/01/2013 |
| Section 62-291 Schedule-Within City Generally | |
| Meter Size (Bi-monthly Charge) | |
| 5/8" | $46.69 |
| 3/4" | $63.06 |
| 1" | $95.82 |
| 1-1/2" | $177.73 |
| 2" | $275.99 |
| 3" | $505.28 |
| 4" | $832.88 |
| 6" | $1,651.83 |
| 8" | $2,634.56 |
| 10" | $3,781.10 |
| Commodity Rate (100 cubic feet = 1 consumption unit) | |
| Single Family Residential | |
| 1 - 15 Units | $0.92 |
| 16 - 75 Units | $1.67 |
| 76 and above | $2.97 |
| All Other Customers | |
| (Multi-Family, Commercial, Industrial, Government, etc.) | |
| 1 - 15 Units | $0.92 |
| 16 - 75 Units | $1.81 |
| Section 62-292. Consumption Charges - Outside City | |
| Meter Size (Bi-monthly Charge) | |
| 5/8" | $58.36 |
| 3/4" | $78.84 |
| 1" | $119.78 |
| 1-1/2" | $222.17 |
| 2" | $345.00 |
| 3" | $631.65 |
| 4" | $1,041.10 |
| 6" | $2,064.81 |
| 8" | $3,293.23 |
| 10" | $4,726.38 |
| Commodity Rate (100 cubic feet = 1 consumption unit) | |
| Single Family Residential | |
| 1 - 15 Units | $1.16 |
| 16 - 75 Units | $2.08 |
| 76 and above | $3.75 |
| All Other Customers | |
| (Multi-Family, Commercial, Industrial, Government, etc.) | |
| 1 - 15 Units | $1.16 |
| 16 and above | $2.30 |
| Section 62-293. Same - Private Fire Service | |
| (A) Inside City Limits | |
| Size of Service Lateral (Bi-monthly Charge) | |
| 2" or less | $65.18 |
| 3" | $113.07 |
| 4" | $169.63 |
| 6" | $313.22 |
| 8" | $454.65 |
| 10" | $598.25 |
| 12" | $711.37 |
| (B) Outside City Limits | |
| Size of Service Lateral (Bi-monthly Charge) | |
| 2" or less | $82.58 |
| 3" | $141.32 |
| 4" | $213.13 |
| 6" | $393.75 |
| 8" | $569.98 |
| 10" | $748.41 |
| 12" | $892.03 |
| Section 62.297 Temporary Service for Contractors | |
| There is a partially refundable deposit for a meter based on the then current price. | |
| Lost, stolen or damaged meter - the Contractor will be responsible for repair and/or replacement cost, as determined by the City. |
|
| Non-Refundable Portion of Deposit | $137.76 |
| Meter Size | |
| 1" | $46.49 |
| 3" | $149.42 |
| Commodity Rate (per 100 cubic feet) | $2.59 |
| Conservation Surcharge (per 100 cubic feet) | $2.69 |
| Charges for Unmetered Construction Water | |
| Concrete Curbs (Per 100 linear feet) | $5.15 |
| Settling Trenches (Per 100 linear feet) | $10.81 |
| Larger Trenches (Determined by Utility Services Dept) | |
| Concrete Walks (Per 100 square feet) | $2.59 |
| Settling Graded Streets (Per 100 square feet) | $1.26 |
| Mixing Curing Concrete (Patented Process, per cubic yard) | $0.53 |
| Settling Filled Ground (Determined by PW Dept) | |
| Miscellaneous (Per 100 cubic feet) | $3.17 |
| Section 62-299 Due Date: Disconnection Fee and Delinquency Charge | |
| Delinquency Charge (20 days after the bill has been issued) | 5% |
| 48 hour Notification Charge | $34.72 |
| Disconnect Order | |
| This charge is applied even if meter is not physically turned-off. | |
| Daily Turn-off/Turn-on (8 a.m. to 4 p.m.) | $37.50 |
|
Restoration Order |
|
|
Daily Turn-off/Turn-on (8 a.m. to 4 p.m.) |
$37.50 |
| Weekends Turn-on (after hours, weekends & holidays) | $72.25 |
| Section 62-321. Connection Charges (System Buy-In Fee) | |
| Based on Meter Size | |
| 5/8" | $2,642.36 |
| 3/4" | $3,963.54 |
| 1" | $6,605.94 |
| 1 1/2" | $13,211.94 |
| 2" | $21,139.15 |
| 3" | $42,278.36 |
| 4" | $66,060.00 |
| 6" | $132,120.04 |
| 8" | $211,392.10 |
| 10" | $303,876.15 |
| Section 62-322. Connection Charges Main Extension Charges | |
| Per Front Foot | $71.77 |
| Section 62-241. Application for Connection | |
| (Charges are for new service.) | |
| Daily - Set up charge (8 a.m. to 4 p.m.) | $49.98 |
| Weekends (after hours, weekends & holidays) | $86.17 |
| Section 62-242.Charges | |
| (Charges are for new construction and meter upgrades.) | |
| Charges for meter downgrades are based on actual expenses for work performed. | |
| Service Size (Installation) | |
| 1" | $4,720.77 |
| 1 1/2" | $6,348.12 |
| 2" | $6,926.82 |
| Meter Size (Meter Setting) | |
| 5/8" x 3/4" | $879.61 |
| 1" | $1,267.99 |
| 1 1/2" | $2,341.87 |
| 2" | $2,833.19 |
| Minimum Charge for Meter/Service Installation | |
| Outside City Limits | $4,130.61 |
| Section 62-243. Advance Payment Required | |
| Minimum | $148.76 |
| Maximum | $5,538.18 |
| Payment based on meter size | |
| Residential | |
| Meter Size | |
| 5/8" | $148.76 |
| 3/4" | $148.76 |
| 1" | $177.39 |
| 1 1/2" | $227.49 |
| 2" | $267.55 |
| 3" | $357.71 |
| Commercial | |
| Meter Size | |
| 5/8" | $227.49 |
| 3/4" | $227.49 |
| 1" | $294.75 |
| 1 1/2" | $357.71 |
| 2" | $450.72 |
| 3" | $631.04 |
| 4" | $795.60 |
| 6" | $1,337.98 |
| 8" | $1,790.21 |
| 10" | $2,243.84 |
| Irrigation | |
| Meter Size | |
| 5/8" | $267.55 |
| 3/4" | $267.55 |
| 1" | $357.71 |
| 1 1/2" | $540.90 |
| 2" | $721.21 |
| 3" | $1,083.26 |
| Firelines | |
| Meter Size | |
| 2" | $148.76 |
| 3" | $227.49 |
| 4" |
$316.20 |
| 6" | $589.55 |
| 8" | $851.42 |
| 10" | $1,124.74 |
| 12" | $1,337.98 |
| Fire Hydrant Meters | |
| Meter Size | |
| 1" | $429.24 |
| 3" | $1,431.01 |
| Section 62-244. Advance Payment by Non-resident Consumer | |
| (Payment based on meter size) | |
| Minimum | $148.76 |
| Maximum | $5,538.18 |
| Section 62-248. Private Fire Protection | |
| Unauthorized Use of Fire Protection Service | |
| Per Incident | $535.88 |
| Section 62-195 Reclaimed Water | |
| Reclaimed Price set at 70% of Potable Rate | |
| Per A.F. | $542.60 |
| Impaired Water Price Set at Average of Reclaimed and Potable | |
| Per A.F. | $658.87 |
| Section 62-208. Tampering with Meter | |
| Missing and/or Broken Lock | $19.43 |
| Meter and/or Jumper Pull | $144.58 |
| Valve Damage and/or Tampering | $315.64 |
* All rates are adjusted on January 1st of each year in accordance with Pomona City Code Sec. 62-271 and Sec. 62-400.